Product
Consists of the design of an executive control program of a plan.
When
It is considered advisable to use this approach whenever you want to monitor the progress of a plan and fully understand its status
Where
The analysis is carried out both at the company’s premises and at Fair Play Bizlabs.
Why
Widespread clarity of objectives, transparency in measurement, and continued pressure against the plan are key elements in the actionability and success of any action plan. Plans are often multifaceted, challenging, and impact multiple business areas, so cross-functional oversight is necessary to have a normalized view of plan progress.
Time Frame
Timelines depend on the duration of the plan and its scope.
Approach
A minimum team of one and maximum of three experts, one of whom is always senior, participate in the program. After detailing the action plan for each site of the plan in an objective and shared manner, recursive checkpoints are set that allow monitoring of the plan’s progress.
Output
A detailed Work Progress report for each plan checkpoint, with evidence of risk and criticality advances.
Our Difference
We stand in support of management, interacting proactively with the various business areas involved and being driven by the achievement of plan objectives